INTERIM CRYOGENIC PROPULSION STAGE FOR SLS
National Aeronautics and Space Administration → $1.3B to THE BOEING COMPANY
Judge how your money was spent, worth it or wasteful, on the record.
Be the first to put your opinion on the record.
✦ WHY THIS MONEY IS BEING SPENT
WHAT IS THIS?
This is a contract where NASA (National Aeronautics and Space Administration) is paying Boeing $1.3 billion to build a component called the Interim Cryogenic Propulsion Stage, which is an upper rocket stage that uses super-cold liquid fuel to push spacecraft away from Earth's orbit toward deep space destinations. Boeing will design, manufacture, and deliver this stage as part of the SLS (Space Launch System), which is America's large rocket built for deep space missions.
WHY WAS THIS FUNDED?
This award is part of NASA's SLS program, which was authorized by Congress through the NASA Authorization Act of 2010. That law directed NASA to develop a powerful new rocket capable of sending humans and cargo beyond low Earth orbit, including to the Moon and eventually Mars.
WHAT PUBLIC PROBLEM IS IT TRYING TO SOLVE?
After the Space Shuttle program ended, the United States needed a new, more powerful rocket to carry astronauts and heavy cargo on deep space missions. This contract addresses that gap by funding a key part of the rocket that gives spacecraft the extra push needed to travel beyond Earth's orbit.
WHO BENEFITS?
Aerospace workers in Alabama and across the country benefit through jobs in manufacturing, engineering, and testing. The broader public benefits through the advancement of American human spaceflight capability and the scientific knowledge gained from deep space exploration missions.
WHAT ARE THE RISKS?
Large, long-term aerospace contracts like this one carry risks of cost overruns, schedule delays, and technical challenges that can push expenses above the original budget. The contract type is listed as unknown in the available data, which makes it harder to assess how financial risk is shared between the government and Boeing.
WHAT HAPPENS IF FUNDING IS REMOVED?
If this contract were cancelled, NASA would lose a critical piece of hardware needed to complete the SLS rocket, likely halting or significantly delaying planned deep space and lunar missions. It could also result in the loss of specialized aerospace jobs and require NASA to find an alternative solution, which could take years and significant additional cost.
ARGUMENTS FOR
- •The SLS and its components represent a national investment in deep space exploration, including the Artemis program to return Americans to the Moon and eventually travel to Mars.
- •Funding domestic aerospace contracts keeps advanced manufacturing and engineering jobs inside the United States and supports a skilled technical workforce.
- •Having an independent, government-owned heavy lift rocket capability reduces reliance on foreign or commercial providers for high-priority national missions.
ARGUMENTS AGAINST
- •Critics argue that the SLS program has experienced significant cost overruns and delays, raising questions about whether this is an efficient use of taxpayer money compared to commercial rocket alternatives.
- •The long contract period from 2012 to 2027 means taxpayers are committed to a very large, multi-decade expense with limited flexibility to switch to newer or cheaper technologies.
- •Some space policy experts contend that private companies have developed competitive heavy-lift rockets at lower cost, making a large government contract like this potentially redundant or wasteful.
✦ SPENDING TIMELINE
Citizen opinionWritten opinion on whether this spending is appropriate · not a duplicate of the Worth It / Wasteful vote or trade data
Is this spending appropriate?
Similar opinions on this spending record can open a solution poll. Context: After the Space Shuttle program ended, the United States needed a new, more powerful rocket to carry astronauts and heavy cargo on deep space missions. This con
ENTITY-LOCAL CLUSTER
No clustering opinions yet on this item. 3 similar voices (cosine ≥ 0.80) open a solution poll.
Loading opinions…
Your stance is citizen opinion; it does not form a citizen mandate. Mandate accountability applies when Congress votes on tracked legislation.